- Tally 7.2 To Tally 9 Migration Tool Free Download
- Tally 7.2 To Tally 9 Migration Tool
- Tally 7.2 To Tally 9 Migration Tool
- Migrating Tally7.2 data to Tally.ERP 9 Customers using Tally 7.2 have to execute the steps shown in order to upgrade their existing data from Tally 7.2 to Tally.ERP 9. 1.Double click on the Tally72migration.exe 2.Tally Data Migration and Tally.ERP 9 start simultaneously in separate screens 3.As soon as Tally.ERP 9 is loaded, a message Ready.
- Migration.log The migration.log file provides: Date of data migration. The name of the company opened for migration. Migration start time. Time taken and the data migration information, such as, masters, vouchers and reports from Tally 7.2 to Tally.ERP 9. Number of errors, if any.
- The correct way of transfering data from 7.2 to ERP9.0 is using the Tally Data Migration Tool using which you can transfer data from 7.2 to Tally 9 this tool is available in your Tally.
- Tally 7.2 Release 3.14 Lite Installer without Reference Manual (includes Stat 54) Tally 7.2 Release 3.14 – Reference Manual Tally 7.2 Release 3.14 – Last certified statutory update – Stat 62.
Basics about Tally Copying masters from one company to another Cost Category and Cost Centre Download ODBC software Download PayCheck 2.0 software Download Tally 7.2 Download Tally 7.2 to Tally 9 Migration Utility Download Tally 9 Excise Duty Export and import data from one company to another Exporting of Data from Tally Fringe Benefit Tax(FBT.
Last Updated on
You can migrate TCP files using the Tally.ERP 9 Data Migration Tool. The files that are successfully migrated follow the same folder structure as that of the source.
To migrate TCP files from Tally 7.2 to Tally.ERP 9
Click Migrate TCP from Tally.ERP 9 Data Migration screen.
A confirmation message Migrate TCP(s)? Yes or Nois displayed.
SelectYes to continue with the migration of TCP Files.
On migrating the TCP file from Tally 7.2 to Tally.ERP 9, a congratulatory message is displayed as shown below:
Press Enter to continue.
Post Migration Observations for the TCP Files
The migrated TCP file is saved in the same folder as Tally 7.2 TCP file.
The migrated TCP filename is suffixed with the digit 9 as shown, and appears in the same in the Tally.ini:
Tally data migration
Tally 7.2 To Tally 9 Migration Tool Free Download
Data created in Tally 7.2 or TCP (Tally Compliant Product) files created for use with Tally 7.2 cannot be used with Tally ERP 9. Hence, Data and TCP files need to be upgraded for use with Tally ERP 9. The Tally Data Migration Tool helps users to upgrade Data and TCP files in order to be compliant with Tally ERP 9. A valid Tally ERP 9 license is required to upgrade Data or TCP files from Tally 7.2 to Tally ERP 9.
Tally 6.3 users can use the migration tool to rewrite data to Tally 7.2 and then migrate to Tally ERP 9. A logical migration of data from the earlier version of Tally 9 will occur when you load the company for the first time in Tally ERP 9.
To Start the Migration Tool
By default the Tally Data Migration Tool is available in the Tally ERP 9 folder.
To start the migration tool double click on the tally72migration.exe
The Tally Data Migration Tool and Tally ERP 9 screens open simultaneously.
The Migrate Company menu has the following options:
1.Migrate Data allows the user to upgrade Tally 7.2 data to Tally ERP 9
2.Migrate TCP allows the user to upgrade TCP files created in Tally 7.2 to Tally ERP 9
3.Restore 7.2 Backup – allows the user to restore data backup taken in Tally 7.2
Tally 7.2 To Tally 9 Migration Tool
Migration Messages Pane
Tally 7.2 To Tally 9 Migration Tool
The migration status is displayed in the Migration Messages pane
Calculator Pane
The Calculator pane in the Tally ERP 9 screen displays any error messages that appear during the migration process.